SIZE | BUST | WAIST | HIPS | |
---|---|---|---|---|
XS | 0-2 | 32/33 | 24/25 | 34/35 |
S | 4-6 | 34/35 | 26/27 | 36/37 |
M | 8-10 | 36/37 | 28/29 | 38/39 |
L | 12-14 | 38/40 | 30/32 | 41/42 |
XL | 16-18 | 40/42 | 34/36 | 44 |
2XL | 20 | 44/45 | 38/40 | 46 |
by Fmeaddons
Womens Pink Lily Short Dresses | Behind Schedule Striped Flutter Sleeve Dress Dark Blue
$ 102.50 $ 40.00
Details Indigo and white stripe dress Fabric has no stretch Tiered skirt with ruffle flutter sleeves Pair this adorable dress with sandals and a fedora S…
In stock
Description
Details Indigo and white stripe dress Fabric has no stretch Tiered skirt with ruffle flutter sleeves Pair this adorable dress with sandals and a fedora Skirt lined Size small from shoulder to hem: 33.5" Material and Care 85% rayon, 15% linen Hand wash, lay flat to dry Patterns may vary Materials may have natural variations Colors may vary from different viewing devices.
You must be logged in to post a review.
- 100% Secure Shopping
- Free Shipping Over $ 60
- Secure Shopping SSL Encryption
- As Soon As Possible Delivery
- Payment Methods:
Reviews
There are no reviews yet.